Most Recently Completed Jobs:
Barnett Reservoir Madison, MS
Hydraulically removed 4,500 cuyds of sedimentation into a Geo-bag containment, located over 5,000’ away, by utilizing a barge mounted booster pump and boat access crossings. All recovered material was reused at an offsite location.
Hydraulically removed 5,000 cuyds of sedimentation into a dewatering basin, located over 4,000’ away, by utilizing a barge mounted booster pump and boat access crossings. The removal of sediments allowed lakefront property owners to access private boat docks again.
Bay Springs, AL
Hydraulically removed 1,500 cuyds of river sediment into a Geo-bag containment, located 3,200’ away. This removal of sediments allowed for transportation barges to access loading chutes and regained loadout capacities.
Hooks Lake, AL
Hydraulically removed 5,000 cuyds of river sedimentation that previously denied barges access to loading and unloading docks. The sediments were pumped to a remove settling pond approximately 2,400’ away.
EJI Montgomery, AL
Mechanically removed 1,200 cuyds of sand into hopper barges. The removal of the sandbar allowed for boat access for a new riverside park development.